Chinese  
Position:World of Civil Aviation

Airport of Angola Lu Na repairs track newly to be able to descend plane of the b

From;    Author:Stand originally
Angola nation airline (TAAG Angola Airlines) with An Hang examination committee chairman represents, plane of the biggest load already can be in Moxike (Moxico) Lu Na airport (Luena Airport) descend, track safety condition is at present good, can descend the big, medium-sized aircraft such as Boeing 727-200 and Boeing 737-900.

The runway after repair is 3200 meters long, 45 meters wide. Although track already was thrown,use, but the job of the 3rd phase still is continueing, like laid bitumen road surface, installation illume, build infrastructure of enclosure and airport other, concerned job will arrive continuously this year in December.



Related Articles
Hot Concern
Random Recommendation
Column list
About us | Legal Notices | Sitemap | Links | Partner